2010 CONSTRUCTION CONTRACT ADMINISTRATION SUBMITTAL REVIEW / SITE OBSERVATION
When: 23 October 2010
Location: JAMA | 950 S. Grand Avenue | Los Angeles, CA 90015
PARKING: Free - self-parking in parking garage on site.
RESERVATIONS REQUIRED by: OCT. 18, 2010. REGISTRATION IS FIRST COME, FIRST RESERVED -- PREPAID. SPACE IS LIMITED TO: 100 PARTICIPANTS AT JAMA IN LOS ANGELES.
To Download the Registration Form, CLICK HERE
Intern Development Program (IDP) candidates earn supplementary education credit(s) (elective credit[s]) for attending this seminar/lecture. These credits can be used to satisfy IDP requirements for credit hours.
schedule:
7:30 - 8:15 a.m. REGISTRATION + COFFEE and PASTRIES.
8:15 - 8:30 a.m. WELCOMING REMARKS: Frank Bostrom AIA CSI APA
8:30 - 9:05 a.m. TOPIC: SESSION ONE : PURPOSE and REVIEW of SHOP DRAWINGS and SUBMITTALS
- Richard Dachman AIA -- Project Director LEO A DALY
- Julie Dobyns CHC, EDAC, LEED AP BD+C -- DPR Construction (#57 on Fortune's 100 Best Companies to Work For in 2010)
- Bobby Arbias P.E. --- KPFF Consulting Structural Engineers
9:05 - 9:40 a.m. TOPIC: SESSION TWO: BIM - HOW IS IT CHANGING SHOP DRAWING and SUBMITTAL REVIEW?
- Jason King LEED ®AP, BIM Engineer / Scheduler -- DPR Construction
- Andrew Wilson CSI, CCS, CCA, LEED®AP--- President AWC WEST
- Marcello Sgambelluri SE --- Project Manager & BIM Director JAMA
9:40 - 10:00 a.m. * REFRESHMENT BREAK *
10:00 - 10:35 a.m. TOPIC: SESSION THREE: WEB BASED MANAGEMENT
- Hossain Ghaffari PE PhD -- Project Manager JAMA
- Damian Buessing -- Project Manager Hensel Phelps Construction Co
- Debra Gerod AIA, LEED ®AP --- Gruen Associates
- Jim Forester P.E. --- Senior Technical Advisor Newforma, Inc.
10:35 - 12:00 a.m. PANELIST REBUTTAL TIME and QUESTIONS FROM THE AUDIENCE FOR PANEL
12:00 - 12:30 p.m. * LUNCH - REFRESHMENT BREAK *
12:30 - 1:05 p.m. TOPIC: SESSION FOUR: ALTERNATIVE DELIVERY METHOD'S IMPACT on SHOP DRAWING REVIEWS
- Dave Hagan LEED© AP --- Director of Health Care Development
- R K Stewart FAIA, LEED® AP -- Principal of Perkins + Will
- Barbara Wagner Senior Vice President -- Clark Construction
1:05 - 1:40 p.m. TOPIC: SESSION FIVE: ROLES and RESPONSIBILITES of the A/E REPRESENTATIVE
- Dean Vlahos FAIA, CSI, CCCA, LEED® AP --- Partner/Architect and Director of Architectural Forensics at DLR Group WWCOT
- Chuck Whitaker -- Principal JAMA
- Sam J. Muir, Esq -- Collins, Collins, Muir & Stewart, LLP
1:40 - 2:15 p.m. TOPIC: SESSION SIX: OWNERS and CONTRACTORS EXPECTATIONS of ARCHITECTS and ENGINEERS DURING CONSTRUCTION
- Robert Cull --- Executive Project Director Facilities Planning, Design and Construction Cedars-Sinai Medical Center
- Bruce Nelson -- Nelson + Okerlund Project Management
- Joe Back AIA, CSI, CCS -- Associate Senior VP for Campus Development & Facilities Management University of Southern California
2:15 - 2:45 p.m. PANELIST REBUTTAL TIME and QUESTIONS FROM THE AUDIENCE FOR PANEL 2010 CONSTRUCTION CONTRACT ADMINISTRATION SUBMITTAL REVIEW / SITE OBSERVATION
*** PARKING * DIRECTIONS * SECURITY ***
If you drive, go North on Olive Street and turn left into the last driveway of the Parking Structure (the entrance without any bollards) and proceed up the ramp. Stay to the left and speak to the police officer. Park in any unmarked parking spaces on Levels P3 thru P6.
After parking your car, proceed to elevator. Push "1" to get to the security check-point lobby. After you have cleared security, [see Step 4 this page] go through the turnstile using your badge, to interior elevator, then proceed to the 4th Floor.
For Pedestrians, there is ONLY one (1) entrance. ONLY the Olive Street entrance is open on Saturday.
*** ALLOW TIME FOR SECURITY CHECK IN TO OCCUR IN YOUR PLANS ***
Parking is HIGH FEDERAL SECURITY. They search your trunk, under the car etc. Be prepared to stop, identify yourself and be searched. After entering the building you will be logged in and may be searched again. [On the other hand, once in the lecture hall, you are very, very safe.]
Visitor Parking at LA Branch | JAMA
Step 1:
To find the parking lot entrance, you turn off of Olympic onto Olive. For your reference, the building at the corner of Olympic and Olive is the former Fed building (gray marble) which has been converted to residential lofts called The Reserve.
Step 2:
Once you pass this building, ours is next door (brown marble). Stay in the far left lane on Olive and the parking entrance is the last opening of our building - fourth driveway; the other entrances are for deliveries.
Step 3:
Proceed up the ramp, stay to the left and stop at the guard station. Notify the Federal Reserve Police Officer the reason for your visit. The Police Officer will already have a manifest with your arrival information. After confirming the identity of the vehicle occupants, our Police Officer will conduct a brief undercarriage search of your vehicle and will instruct which floor to park.
Step 4:
Once you park, take the elevator to the first floor. Everyone entering the Bank will be required to walk through the metal detector and all carried items will be screened by use of an x-ray machine. Items determined to be weapons will not be permitted (eg.: guns, knives, pepper spray, mace, etc.). Anyone found to be in possession of illegal weapons will be subject to arrest. In addition, cameras are not permitted inside the building.
Police Services will notify your point of contact of your arrival. Your contact will meet you at the entrance and escort you into the building.
Reminder:
- All visitors must provide government-issued photo identification (e.g. valid passport, driver's license, or state-issued identification card) that matches their name as it appears on the manifest.
- All visitors must have confirmed prior arrangements for their visit with their LA Branch contact in order to receive entrance into the building.
- We have security checks similar to those at airports.
Last Updated: August 5, 2010



