LCI + AIA|LA Healthcare Committee Jointly Present: Lean Workshop: Proof of Concept
When
Where
June 23, 4:30-6:30PM
Herman Miller Los Angeles - 3641 Holdrege Ave., Suite 100 Los Angeles, CA 90016
committee

LCI + AIA|LA Healthcare Committee Jointly Present: 

Lean Workshop: Proof of Concept



MEETING IS FULL!


Thursday, June 23, 2016, 4:30-6:30pm

Herman Miller Los Angeles, 3641 Holdrege Ave., Suite 100 Los Angeles, CA 90016

Parking Instructions: Free parking is available in the lot directly south of the building. Free street parking is also available.

Food/Beverage Host 

LCI + AIA|LA Healthcare Committee Jointly Present: Lean Workshop: Proof of Concept

The Lean Construction Institute, Los Angeles, and AIA|LA Healthcare Committee are excited to host a joint event this June. Stan Chiu and Edwin Najarian will be presenting two case studies representing outstanding examples on Integrated Lean Project Delivery, and the tools and culture that drive performance.

Case Study #1: Sutter Medical Center Castro Valley

For the 1st time in the U.S., an 11-party IPD team including the Owner, all co-signed an Integrated Form of Agreement (IFOA) contract, requiring them to work collaboratively, extensively use 3D BIM technologies, and implement lean practice, in a shared risk, shared reward environment, to design and deliver this hospital project in California within a 30% accelerated schedule and aggressive budget targets. The project has completed successfully and won several awards for the innovation approach in design and project delivery.

Case Study #2: UHS Spring Valley Bed Tower

While all projects are faced with challenges and struggles, the return on investment has been proven for spending the capital and time on creating an environment focused on team health and synergy; therefore, driving a team to rise above the challenge and redirect their energy toward innovation, performance driven results and enhanced profit. – MYTH BUSTED.

Speaker Bios:


Stan Chiu, AIA, LEED AP

Principal, Vice President, HGA Architects and Engineers

Stan brings extensive IPD experience and over 20 years of healthcare experience.  His projects are characterized by a culture that drives performance, an extensive and appropriate use of lean tools, outstanding results and enduring friendships.


Edwin Najarian, SE

Principal, Vice President, TTG Engineers 

Edwin has been practicing structural engineering for over 20 years and has been branch manager in TTG’s corporate headquarters, in Pasadena and the principal-in-charge on several projects involving IPD, BIM and 3D virtual design. Project specific involvement includes collaborative structural designs implementing Lean Project Delivery (LPD). Edwin has published articles in several trade publications, focusing on innovative strategies in design and project delivery.